Bathroom renovation: where to Begin

The bathroom is an area with specific conditions: high humidity, humidity differences. That is why making repairs in the bathroom, you need to clearly plan the entire working process, to think about the sequence of measures to be achieved. In the following report, you will learn the way to start the fix in the bathroom and what kinds of work should be performed together with your own hands. Step-by-step directions for toilet repair

Stage 1: Establishing a plan and deciding upon a design solution.

Fix in the toilet can be of two types:

  • Unplanned, spontaneous, originating from the will of unexpected circumstances. For example, in case of a pipe burst, flooding by neighbors.
  • Planned, which is either cosmetic or capital. It requires preparation, serious fiscal investment and time.

Begin repairs at the bathroom is to find out the design, interior. Think through vsyakuhnya.ru the last detail, what will be the space, select a colour. Pastel colours are conventional, as well as a mixture of blue and blue, or cherry with beige.

Begin repairs in the bathroom is to ascertain the plan, interior layout. Think in detail, what’s going to be the room, choose a colour. Pastel colors are thought to be traditional, in addition to a mix of colours.

The next point is the choice of facing material. As a rule, finishing in the bathroom is done with vinyl, porcelain tiles, mosaicand vinyl panels. Examine the pipes, whether it ought to be mended. If needed, pick a suitable option. Proceed to the measuring function: step all sides, calculate the area of the area. Based on these information, we mark the location of the plumbing fittings.

Step 2: the selection of sanitary fittings and material for finishing.

It is important to realize that the purchase of sanitary ware precedes the preparation stage, and not vice versa. This usually means that first we create a new design project, make a plan, then go to the store. The following point – you should specify the size of your favourite plumbing fittings and inspect the program, whether it matches.

It is very important to recognize that the purchase of plumbing fixtures is completed by a planning period, rather than vice versa. This means that first we create a design project, create a plan, and then go to the store. Another one

In terms of materials for finishing, it is preferable to purchase them immediately for the whole repair cycle, so that then you will not be distracted if something has been missing. Remember about preparing the essential tools.

Measure 3: dismantling tiling and plumbing.

After All of the preliminary work is completed, proceed to the beginning of the work process:

  • Eliminate the sink and bathtub from the space, even though they won’t be replaced with fresh ones. In this manner, you can keep them intact and clean.
  • Eliminate the tile, cleaning following it all of surfaces: walls, ceiling, floor.
  • Remove old paint from the walls, even if they were previously painted, since the glue solution or a fresh layer of paint won’t stick to the surface.

Step 4: replacement of communications: plumbing, electric wiring.

Very often in an old home, you ought to carefully inspect and replace not just the pipes which are in the bathroom itself, but in addition the main riser, and sometimes the interfloor plumbing. What’s it worth doing so? Old pipes at any time can give a flow, then the new repair is going to be spoiled, it is going to call for additional investment to get rid of defects.